  • volk

    Thanks, that's what I figured. Just have to watch the 25' cord length that is included with the PDU.

  • volk

    Getting the AP7582 http://www.apc.com/resource/include/techspec_index.cfm?base_sku=AP7582 to supplement the new racks AR3100 and UPS with our existing UPS. The suggested installation is on the bottom of the rack. I would like to install it in the middle, instead, to allow servers from the top of the rack to reach. Has anyone run in to problems with installing the PDU in the middle of the rack? Thanks!

  • dirtfoot

    Hi Volk,
    I don't see a problem with mounting this PDU anywhere you needed to. Its pretty light, and shouldn't really affect much if it were mounted in the middle or top of your racks.